JAMC

Article http://dx.doi.org/10.26855/jamc.2020.12.011

Integration of Uncertainty in Profit Planning: A Current Application

TOTAL VIEWS: 7420

Sajedeh Beykaei, Joseph Abekah, Abdur Rahim *

University of New Brunswick, Fredericton, Canada.

*Corresponding author: Abdur Rahim

Published: December 11,2020

Abstract

Use of cost-volume-profit analysis for actual planning is often limited by an ina-bility to properly incorporate uncertainty in the analysis when assumptions about known price and costs do not hold. We use currently available analysis software (MAPLE) in this study to demonstrate that uncertainty can be incorporated in Cost-Volume-Profit analysis and planning in practice. We show in our examples that expected selling price and variable cost changes have greater influence on expected breakeven sales levels than the impact of the standard deviations of selling price and variable cost. In particular, decreases in the expected selling price are shown to lead to significantly sharp declines in the expected breakeven quantity. By contrast, when the standard deviations of selling price or variable costs increase, only proportionate increases in the breakeven quantity are observed.

References

[1] Hilliard, J. E., & Leitch, R. A. (1975). Cost-Volume-Profit Analysis under Uncertainty: A Log-Normal Approach. The Accounting Review, 39, 917-926.

[2] Hilliard, J. E., & Leitch, R. A. (1979). A Stochastic Analysis of Breakeven Points. AIIE Transactions, 11(3), 250-253.

[3] Jaedicke, R. K., & Robichek, A. A. (1964). Cost-Volume-Profit Analysis under Conditions of Uncertainty. The Ac-counting Review, 39, 917-926.

[4] Garg, A., Ghosh, D., Hudick, J., & Nowacki, C. (2003). Roles and Practices in Management Accounting Today. Strategic Finance, 85(1), 30-35.

[5] Kee, R. (2007). Cot-Volume-Profit Analysis Incorporating the Cost of Capital. Journal of Managerial Issues, 19(4), 478-493.

[6] Xi-juan, S., & Jun-ying, F. (2007). Stochastic Cost-volume-value Model with Economic Demand and Cost Function. IEEE, 3927-3930.

[7] Edinburg, L. G., & Wolcott, S. K. (2005). Cost Management: Measuring, Monitoring, and Motivating Performance. New York: John Wiley & Sons.

[8] Chrysafis, K. A., & Papadopoulos, B. K. (2009). Cost-Volume-Profit Analysis Under Uncertainty: a Model with Fuzzy Estimators Based on Confidence Intervals. International Journal of Production Research, 47(21), 5977-5999.

[9] Liao, M. (1975). Model Sampling: A Stochastic Cost-Volume-Profit Analysis. The Accounting Review, 50(4), 780-790.

[10] Magee, R. P. (1975). Cost-Volume-Profit Analysis, Uncertainty and Capital market Equilibrium. Journal of Ac-counting Research, 257-266.

[11] Shih, W. (1979). A General Decision Model for Cost-Volume-Profit Analusis under Uncertainty. The Accounting Review, LIV(4), 687-706.

[12] Jarrett, J. E. (1973). An Approach to Cost-Volume-Profit Analysis under Uncertainty. Decision Sciences, 4(3), 405-420.

[13] Kim, C. (1973). A Stochastic Cost Volume Profit Analysis. Decision Sciences, 4(3), 329-342

[14] Johnson, G. L., & Simik, S. S. (1974). The Use of Probability Inequalities in Multiproduct C-V-P Analysis under Uncertainty. Journal of Accounting Research, 12(1), 67-79. 

[15] Ismail, B. E., & Louderback, J. G. (1979). Optimizing and Satisficting in Stochastic Cost-Volume-Profit Analysis. Desicion Sciences, 10, 205-217.

[16] Karnani, A. (1982). Stochastic Cost-Volume-Profit Analysis in a Competitive Oligopoly. Desicion Sciences, 14, 187-193.

[17] Kottas, J. F., & Lau, H.-S. (1978). Stochastic Breakeven Analysis. Journal of Operational Research Society, 29(3), 251-257.

[18] Kottas, J. F., & Lau, H.-S. (1979). On Handling Dependent Random Variables in Risk Analysis. Journal of Opera-tion Research, 30(8), p.775.

[19] Shao & Jun Ying. (2007). Stochastic Cost-Volume Model with Economic Demand Cost function.

[20] Chung, K. H. (1990, 36 November). Output Decision under Demand Uncertainty with Stochastic Production Func-tion: A Contingent. Management Science, 1311-1328.

[21] Chung, K. H. (1993). Cost-Volume-Profit Analysis Under Uncertainty When the Firm has Production Flexibility. Journal of Business, Finance and Accounting, 20(4), 583-591.

[22] Said, H. A. (2016). Using Different Probability Distributions for Managerial Accounting Technique: The Cost-Volume-Profit Analysis. Journal of Business and Accounting, 9(1), 3-4.

[23] Wilson, K. C. (2016). Continuous Improvement Methodologies in Public Sector of Solid Wast Management: A New Brunswick Case Study. Master Of Business Administration Thesis, University of New Brunswick. Fredericton, Canada.

[24] Punnlyamoorthy, R. (2017). Examining Cost Volume Profit and Decision Tree Analysis of a Selected Company. Journal of Multidisciplinary Research Development, 3(9), 224-233.

[25] Souraj Salah. (2017). Lean Six Sigma and Innovation: Comparison and Relationship. International Journal of Business Excellence, 13(4), 479-493.

[26] Enkeleda Lulaj, & Etem Iseni. (2018). Role of Analysis CVP ( Cost-Volume-Profit) as Important Indicator for Planning and Making Decisions in  Business Environment. European Journal of Economics and Business Studies, 4(2), 99-114.

[27] Enyi Patrik Enyi. (2019). Joint Products CVP Analysis-Time for Methodical Review. Journal of Economics and Business, 2(4), 1288-1297.

[28] Nagar, V., Schoenfeld, J., & Wellman, L. (2019). The Effect of Economic Policy Uncertainty on Investor Informa-tion Asymmetry and Management Disclosures. Journal of Accounting and Economics, 67(1), 36-57.

[29] Madhani, Pankaj M. (2020). Customer-Focused Supply Chain Strategy Developing 4Rs Framework for Enhancing Competitive Advantages. International Journal of Services and Operations Management, 36(4), 505-530.

[30] Oppusunggu, Lis Sintha. (2020). Importance of Break Event Analysis for the Micro, Small l and Medium Enter-prises. International Journal of Research -GRANTHAALAYAH, 8(6), 212-218.

[31] Matta, Renato de. (2017). Product Costing in Strategic Formation of Research, a Supply Chain. Annals of Opera-tions Research, 272(1-2), 389-427.

[32] Beykaei, S. S. (2012). Integration of C-V-P Analysis and Quality Cost in Production Systems. MBA Thesis, Uni-versity of New Brunswick, Fredericton (April).

[33] Abekah, J., Beykai, S. S., & Rahim, A. (2013). Operationalizing Cost-Volume-Profit Analysis Under Uncertainly. Paper presented at the Atlantic Schools of Business Conference. Antigonish, NS, Canada (September). 

[34] Brockett, P. L., Charnes, A., Cooper, W. W., & Shin, H. C. (1984). A Chance Constrained Programming Approach to Cost-Volume-Profit Analysis. Accounting Review, 59(3), 474-487.

[35] Brockett, P. L., Charnes, A., Cooper, W. W., & Shin, H. C. (1987). Cost-Volume-Utility Analysis with Partial Sto-chastic Information. Quarterly Review of Economics and Business, 27(3), 70-90.

[36] Lau, A. H.-L., & Lau, H.-L. (1987). CVP Analysis with Stochastic Price-Demand Functions and Shortage-Surplus Costs. Contemporary Accounting Research, 4(1), 194-209.

[37] Yunker, J. A. (2001). Stochastic CVP Analysis with Economic Demand and Cost Function. Review of Quantitative Finance and Accounting, 17, 127-149.

[38] Yunker, J. A., & Yunker, P. J. (1982). Cost-Volume-Profit Analysis Under Uncertainty: An Integration of Economic and Accounting Concepts. Journal of Economics and Business, 34(1), 21-37.

How to cite this paper

Integration of Uncertainty in Profit Planning: A Current Application

How to cite this paper: Sajedeh Beykaei, Joseph Abekah, Abdur Rahim. (2020) Integration of Uncertainty in Profit Planning: A Current Application. Journal of Applied Mathematics and Computation, 4(4), 195-205.

DOI: http://dx.doi.org/10.26855/jamc.2020.12.011